FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
7 System Commissioning
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
41
The gas release indicator turns on at the same time.
Figure 7-8
Short-circuiting the pressure announciator terminals
(1) Red and black cables to the pressure
announciator
(2) Cables to the fire alarm control
panel
Step 9
Commission the emergency start/abort switch.