FusionModule1000A40 Prefabricated All-in-One Data
Center
Commissioning Guide
8 Commissioning Core Components
Issue 02 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
74
Step 2
Verify the temperature and humidity settings by referring to the air-cooled smart cooling
product temperature and humidity initial configuration table.
If any initial configuration is inconsistent with the initial setting, change it to the initial
setting.
----End
8.3 Commissioning Monitoring Components
8.3.1 Preparations and WebUI Login
Prerequisites
Computer operating system: Windows 7 and later versions
It is recommended that the screen resolution be 1366 x 768 or higher.
Browser: IE9 and later versions; Firefox and later versions; Chrome and later versions
Procedure
Step 1
Connect a network cable between the PC network port and the WAN_1 port (protected by a
security mechanism) on the ECC800.
Table 8-9
Default IP addresses for the WAN and LAN ports on the ECC800
Port
Default IP Address
WAN_1
192.168.8.10
WAN_2
192.168.0.10
LAN_1 and LAN_2
192.168.248.10