UPS5000-H-1200 kVA
User Manual (100 kVA Power Modules)
3 Installation
Issue 01 (2020-07-15)
Copyright © Huawei Technologies Co., Ltd.
82
No.
Item
Acceptance Criteria
5.
There is no foreign matter on the rear
module subrack.
1.
In the scenarios where holes are drilled or covers are removed for routing cables, use sealing putty to
fill in the gap between the cables and the cabinets after routing cables and checking cable
connections.
2.
After verifying the installation, reinstall all the covers.
3.
Do not remove the dustproof cover before power-on to prevent dust from entering the cabinets.