UPS5000-H-1200 kVA
User Manual (100 kVA Power Modules)
3 Installation
Issue 01 (2020-07-15)
Copyright © Huawei Technologies Co., Ltd.
60
Figure 3-7
Expansion bolt composition
(1) M12 bolt
(2) Spring washer
(3) Flat washer
(4) Expansion sleeve
Knock the expansion bolts into the holes until the expansion sleeves completely fit into the
holes. The expansion sleeves must be completely buried under the ground to facilitate
subsequent installation.
Figure 3-8
Installing an expansion bolt (unit: mm)
1.
Drill a hole into the concrete floor using a hammer drill. The hole depth ranges from 52
mm to 60 mm.
2.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
3.
Partially tighten the expansion bolt.
4.
Remove the bolt, spring washer, and flat washer.