UPS5000-H-1200 kVA
User Manual (100 kVA Power Modules)
4 User Interface
Issue 01 (2020-07-15)
Copyright © Huawei Technologies Co., Ltd.
116
Figure 4-38
USB Operations
Starting or Shutting Down the Inverter
Item
Description
Inv. ON
Allows you to start the inverter manually.
Inv. OFF
Allows you to shut down the inverter manually.
ECM Switchover
Only professional personnel are allowed to use this function.
Clear faults before performing ECM switchover.
After an ECM is inserted, switchover is supported only after the ECM is configured and
starts working properly (about 30 seconds).
If an ECM to be maintained is still working, perform ECM switchover (a dialog box is
displayed for you to confirm this operation). After the switchover is complete, ensure that the
ECM to be maintained is in standby state (that is, the green indicator is blinking) and then
maintain it.
iBOX Control
Reset the specified iBOX and iBAT, and set the iBAT blinking function or measure the iBAT
internal resistance.
Item
Description
Reset
Allows you to restart an iBOX or iBAT.
Blink
Allows you to start or stop the super fast blinking of the red indicator on the
iBAT.