NetCol5000-A021 In-row Air Cooled Smart Cooling
Product
User Manual (208 V)
6 System Operation and Maintenance
Issue 03 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
193
Follow-up Procedure
Power on the NetCol5000-A, Choose
Maint
>
Performance Maint
on the home screen and
then clear the compressor runtime.
6.5.5 Replacing the Welded Filter Dryer
Prerequisites
The filter dryer needs to be replaced.
A spare filter dryer of the same model is available and functional.
Tools: welding equipment, refrigerant retrieval device (configured based on local
conditions), Phillips screwdriver, nitrogen cylinder, refrigerant tank, vacuum pump,
pressure gauge, leather hose, protective gloves
Preparation: Power off the indoor unit and reclaim all refrigerant from the system.
Context
shows the position of the filter dryer.
Figure 6-9
Position of the filter dryer
(1) Liquid pipe NTC temperature sensor
(2) Welding point A
(3) Filter dryer
(4) Welding point B
(5) Welding point C
Procedure
Step 1
Tap
Shutdown
on the LCD home screen and turn off the smart cooling product switch in the
PDC and the compressor switch QF3.
Содержание NetCol5000-A021
Страница 234: ......