(4) Asset detection strip (42 U
detection point)
-
-
Figure 7-10 Installing a smart U space manager (main control box attached to the
top of the cabinet exterior)
(1) Fastener
(2) UIM20A Expansion Module (3) Main control box
(4) Asset detection strip (42 U
detection point)
-
-
Procedure
Step 1 (Optional) If U Asset Label is faulty, perform the following steps to replace them.
1. Remove faulty U Asset Label from the customer equipment and the asset
detection strip.
2. Record the asset according to the commissioning guide.
Step 2 (Optional) If the asset detection strip is faulty, perform the following steps to
replace it.
1. Label the position of each U Asset Label on the asset detection strip.
2. Remove all U Asset Label from the asset detection strip.
3. Remove the faulty asset detection strip.
4. Install a new asset detection strip in the original position.
5. Install the U Asset Label in the original positions based on the position labels.
Step 3 (Optional) If the main control box is faulty, perform the following steps to replace
it.
1. Label each cable based on the corresponding ports on the main control box.
2. Remove the faulty main control box.
iMaster NetEco
Device Installation and Commissioning Guide (Data
Center)
7 Device Maintenance
Issue 02 (2021-05-12)
Copyright © Huawei Technologies Co., Ltd.
292