FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
3 Hardware Installation
Issue 10 (2019-12-20)
Copyright © Huawei Technologies Co., Ltd.
63
Figure 3-36
Installing guide rails
Step 3
Engage floating nuts into appropriate positions on the cabinet column using a floating nut
mounting bar or a flat-head screwdriver, as shown in
. Install two floating nuts on
each side, as shown in
Figure 3-37
Floating nut installation positions