BOM Number
Cable Position
the aisle containment
04093057
Cable from the battery cabinet to the 20 kVA UPS (required for N+1
configuration and battery string sharing)
04151722/0415172
3/04151724
PDU2000 power cable
04080394
Emergency fan cascading cable
04070009
Cable from the VCN to the smart ETH gateway
Cables from the LAN switch to the ECC800
0415G005
VCN power cable
04151689
Ground cable
04071171
Cable from the smoke detector to the ECC800
04151783
Cable for the third smart cooling product
04093981-01
Cable from the smart ETH gateway to the access actuator
04093981-02
Cable from the access actuator to the card reader with a keypad
04093981-03
Cable from the access actuator to the fingerprint and card reader
04093981-04
Cable from the access actuator to the fingerprint and card reader with
a keypad
04093981-05
Cable from the access actuator to the exit button
04093981-06
Cable from the access actuator to the single/double door magnetic
lock and emergency door release button
Cable from the emergency door release button to the single/double
door magnetic lock
A.4 Cooling System Layout
The indoor and outdoor units compose a complete cooling system.
overall layout of cooling devices.