Units
1 MPa ≈ 10 bar
1 MPa ≈ 145 psi
1 MPa ≈ 10.2 kgf/cm
2
2.6 Personnel Requirements
Only trained and qualified personnel who fully understand basic safety precautions are
allowed to install and operate a modular data center.
Huawei will not be liable for any consequence caused by the violation of this document.
The requirements are as follows:
Customers' installation personnel must be trained by Huawei and understand how to
install and operate a modular data center.
The number of installation personnel varies based on the project progress and installation
environment. Typically, two to three persons are required.