![HP 316095-B21 - StorageWorks Edge Switch 2/24 Скачать руководство пользователя страница 81](http://html.mh-extra.com/html/hp/316095-b21-storageworks-edge-switch-2-24/316095-b21-storageworks-edge-switch-2-24_service-manual_164139081.webp)
edge switch 2/24 service manual
2–61
Diagnostics
6
Inspect the front of the switch.
Is the amber LED illuminated but not blinking (beaconing)?
YES
NO
↓
Go to
step 7
.
Contact the next level of support. Exit MAP.
7
Is fault isolation being performed at the HAFM server (or customer-supplied server)?
YES
NO
↓
Fault isolation is being performed at the EWS interface. Go to
step 11
.
8
Does a blinking red and yellow diamond (failed FRU indicator) appear to overlay a fan
module/power supply graphic at the Hardware View?
NO
YES
↓
A fan module failure is indicated. Go to
step 5
.
9
At the Hardware View, does a grey square appear at the alert panel, a No Link status
appear at the Edge-24 Status table, and graphical FRUs appear uninstalled?
YES
NO
↓
A green circle appears at the alert panel and the switch appears operational.
Exit MAP.
The grey square indicates the HAFM server (or customer-supplied server) cannot
communicate with the switch because:
•
The switch-to-server Ethernet link failed.
•
AC power distribution in the switch failed, or AC power was disconnected.
•
The switch CTP failed.
Continue.