![HP 316095-B21 - StorageWorks Edge Switch 2/24 Скачать руководство пользователя страница 135](http://html.mh-extra.com/html/hp/316095-b21-storageworks-edge-switch-2-24/316095-b21-storageworks-edge-switch-2-24_service-manual_164139135.webp)
edge switch 2/24 service manual
3–19
Repair Information
Figure 3–10: Port Diagnostics Dialog Box
8. Click Next. The message
Press START TEST to begin diagnostics
appears, and the Next button changes to a Start Test button.
9. Click Start Test. The test begins and:
— The Start Test button changes to a Stop Test button
— The message
Port xx: TEST RUNNING
appears.
— A red progress bar (indicating percent completion) travels from left to right
across the Completion Status field.
NOTE: Click Stop Test at any time to abort the loopback test.
10. When the test completes, results appear as
Port xx: Passed!
or
Port xx:
Failed!
in the message area of the dialog box.
11. When finished, click Cancel to close the Port Diagnostics dialog box and return
to the Hardware View.
12. Reset the port:
a.
At the Hardware View, right-click the port graphic. A pop-up menu appears.
b.
Select the Reset Port option. A message box displays, indicating a link reset
operation will occur.
c.
Click OK. The port resets.
13. Notify the customer the test is complete and the attached device can be set online.