S
AFETY
Honeywell
• 4
1
c) provision of an additional terminal for a second
protective earthing conductor
of the
same cross-sectional area as the original
protective earthing conductor
.
OR
2. Connection with an industrial connector according to IEC 60309 and a minimum
protec-
tive earthing connector
cross-section of 2.5mm
2
as part of a multi-conductor power
cable. Adequate strain relief shall be provided.
NOTE:
Due to the high capacitive currents present in the drive, fault current protective switches
may not function properly.
1.4
Running the motor
MOTOR RUN CHECK LIST
Do not perform any voltage withstand tests
on any part of the drive. There is a
certain procedure according to which the tests shall be performed. Ignoring this
procedure may result in damaged product.
Before starting the motor
, check that the motor is
mounted properly
and
ensure that the machine connected to the motor allows the motor to be started.
Set the maximum motor speed (frequency) according to the motor and the
machine connected to it.
Before reversing the motor
make sure that this can be done safely.
Make sure that no power correction capacitors are connected to the motor cable.
Make sure that the motor terminals are not connected to mains potential.
Содержание SmartVFD HVAC MR4
Страница 7: ...Honeywell 5 SAFETY ...
Страница 49: ...Honeywell 47 COMMISSIONING ...
Страница 78: ...STARTUP Honeywell 6 ...