15-4
BATTERY/CHARGING SYSTEM
On connecting probes, the screen displays battery pin
number.
Use yellow arrow buttons to select the correct pin number.
According to the reference table given on page (15-3).
To check voltage press “V” button.
VOLTAGE (20°C/68°F):
Fully charged:
More than 12.4 V
Under charged:
Below 12.4 V
BATTERY LOAD TEST
To load test the battery press “TEST” button.
Device will take approx 3 seconds to display result.
Before doing the
load test battery
must be fully
charged
Содержание CB HORNET 160R 2015
Страница 1: ...SHOP MANUAL CB HORNET 160R CB HORNET 160R...
Страница 6: ...1 2 GENERAL INFORMATION MODEL IDENTIFICATION This manual covers 2 type of CBF 160 models STD and CBS...
Страница 38: ...MEMO...
Страница 71: ...MEMO...
Страница 72: ...5 0 FUEL SYSTEM 27 N m 2 8 kgf m 20 Ibf ft COMPONENT LOCATION...
Страница 127: ...MEMO...
Страница 128: ...8 0 CYLINDER PISTON COMPONENT LOCATION...
Страница 137: ...MEMO...
Страница 154: ...10 0 ALTERNATOR 74 N m 7 5 kgf m 55 Ibf ft COMPONENT LOCATION...
Страница 243: ...MEMO...
Страница 288: ...16 0 IGNITION SYSTEM COMPONENT LOCATION FUSE CDI BATTERY SPARK PLUG IGNITION SWITCH IGNITION COIL SYSTEM DIAGRAM...
Страница 299: ...MEMO...
Страница 319: ...MEMO...
Страница 326: ...MEMO...
Страница 327: ...19 WIRING DIAGRAM 19 1 STANDARD AND CBS CB HORNET 160R 19 1...
Страница 333: ...MEMO...
Страница 336: ...Honda Motor Co Ltd 2015 82K43P0 Published by Honda Motorcycle Scooter India Pvt Ltd...