8-3
Chapter 8
Operation Check/Residual Risks
8.4 Residual Risk Checklist
* Installation, wiring, and setting work need to be
performed by specialized technicians.
No.
Operation
stage
Work
Target
section
Residual
risk
Details of harm
Protective measure
√
1
Installation
Installation
(B)
Caution
Damage caused by careless
transport
Do not drop the product. Do not
carry the inverter in a manner that
applies force to the cover or
operator keypad.
2
Installation
Installation
‐
Caution
Reduction of component life
due to use in a location
exposed to direct sunlight or
at a temperature outside the
specification range.
Check that ambient temperature is
within the standard specification
range in the whole year by means
of cooling and ventilation.
3
Installation
Installation
‐
Caution
Failure due to short circuit
caused by using in a
location which humidity and
condensation are out of
standard range described in
specification..
Check that ambient temperature is
within the standard specification
range in the whole year by means
of cooling and ventilation.
Otherwise, install the product in a
location free from condensation.
4
Installation
Installation
(B)
DANGER
The cooling fin that is
heated to exceed 150°C
sets fire to a flammable wall.
Install the inverter on an
inflammable metal wall.
5
Installation
Installation
‐
Caution
Component failure due to
entry of dust, corrosive gas,
or other substances.
Install the inverter inside a totally
enclosed panel.
6
Installation
Installation
‐
Caution
Reduction of a component
life due to degradation of
cooling capability by
horizontal installation
Install it vertically.
7
Installation
Installation
‐
Caution
When the fin is installed
outside the inverter, the
cooling fan fails due to
droplet, oil mist, etc.
When installing the fin outside the
inverter, install it in a location free
from droplet, oil mist, etc.
8
Maintenance
for installation
Electrical
connections
(A)
DANGER
Arc flew out due to screws
that are loosened by
vibration, and set fire to the
internal components.
Check screws are appropriately
tightened on a regular basis.
9
Maintenance
for installation
Electrical
connections
‐
DANGER
Arc flew out due to screws
that are loosened by
vibration, and set fire to
combustibles.
Check screws are appropriately
tightened on a regular basis. Do
not place flammable materials near
the installed inverter.
10
Maintenance
before use
Wiring
Inspection
(A)
DANGER
When the cover is removed,
electric shock is caused in a
high-voltage section.
Do not remove the cover when
power is supplied.
After power is turned off, wait 10
minutes or more to perform
working.
11
Maintenance
before use
Wiring
Inspection
(C)
DANGER
When the operator removes
the cover, electric shock is
caused when a tool touches
a high-voltage section.
Do not remove the cover when
power is supplied.
After power is turned off, wait 10
minutes or more to perform
working.
Содержание SJ Series
Страница 39: ...5 4 Chapter 5 Included Items Memo ...
Страница 52: ...6 13 Chapter 6 Installation Model P1 P1 200V class P1 02950 L P1 550L Dimension W mm H mm D mm 480 700 250 ...
Страница 55: ...6 16 Chapter 6 Installation Memo ...
Страница 91: ...7 36 Chapter 7 Wire Connection and Optional Devices Memo ...
Страница 135: ...9 40 Chapter 9 Operating Instructions Memo ...
Страница 145: ...10 10 Chapter 10 Test Run Memo ...
Страница 159: ...12 2 6 Chapter 12 Inverter Functions Memo ...
Страница 169: ...12 3 10 Chapter 12 Inverter Functions Memo ...
Страница 195: ...12 5 8 Chapter 12 Inverter Functions Memo ...
Страница 217: ...12 8 12 Chapter 12 Inverter Function Memo ...
Страница 287: ...12 10 32 Chapter 12 Inverter Functions Memo ...
Страница 303: ...12 11 16 Chapter 12 Inverter Functions Memo ...
Страница 349: ...12 15 8 Chapter 12 Inverter Function Memo ...
Страница 395: ...12 17 34 Chapter 12 Inverter Functions Memo ...
Страница 397: ...12 18 2 Chapter 12 Inverter Functions Memo ...
Страница 415: ...12 19 18 Chapter 12 Inverter Function Memo ...
Страница 581: ...15 10 Chapter 15 Optional Cassettes Memo ...
Страница 591: ...16 10 Chapter 16 ProDriveNext EzSQ Memo ...
Страница 642: ...18 49 Chapter 18 Tips FAQ Troubleshooting Memo ...
Страница 650: ...19 8 Chapter 19 Maintenance and Inspection Memo ...
Страница 661: ...20 11 Chapter 20 Specifications Model P1 P1 200V class 02950 L 550L Dimension W mm H mm D mm 700 480 250 ...
Страница 662: ...20 12 Chapter 20 Specifications Model P1 P1 400V class 01760 H 750H 02130 H 900H Dimension W mm H mm D mm 390 700 270 ...
Страница 663: ...20 13 Chapter 20 Specifications Model P1 P1 400V class 02520 H 1100H 03160 H 1320H Dimension W mm H mm D mm 480 740 270 ...
Страница 678: ...21 7 Chapter 21 Technical Notes SJ700D SJ P1 ND normal duty SJ700D 550LFF3 P1 02950 LFEF P1 550LFF ...
Страница 686: ...21 15 Chapter 21 Technical Notes SJ700B SJ P1 LD low duty VLD very low duty SJ700B 750LFF P1 02950 LFEF P1 550LFF ...
Страница 781: ...Appendix 1 70 Appendix 1 List of Parameters Memo ...