1. GETTING STARTED
1-3
1.4 Work Flow
The following provides the work flow required until the equipment is turned on.
See “1.6 Installation Environment.”
See “1.7 Hardware connection.”
See “2.1 Before Turning On the Power.”
In case of installing an extension board,
see “6.3.4 Installing and removing an extension board.”
Unpack
Install this equipment
Install
extension boards
Turn on the power
Connect hardware
Содержание HF-W2000
Страница 44: ...This Page Intentionally Left Blank ...
Страница 72: ...This Page Intentionally Left Blank ...
Страница 84: ...2 OPERATION 2 12 4 Click ACPI x64 based PC Microsoft ACPI Compliant System PCI Express Root Complex ...
Страница 102: ...This Page Intentionally Left Blank ...
Страница 133: ......
Страница 134: ...This Page Intentionally Left Blank ...
Страница 176: ...This Page Intentionally Left Blank ...
Страница 204: ...This Page Intentionally Left Blank ...
Страница 245: ...This Page Intentionally Left Blank ...
Страница 279: ...This Page Intentionally Left Blank ...
Страница 323: ...This Page Intentionally Left Blank ...