6 Using the heating system – TIME menu
98
HDG M299/300/350/400 - Version 1 - en
©
HDG Bavaria GmbH 07/2008
S
ETTING
THE
GRATE
TIMES
This submenu is used to set the time for the grate motion and thus
the de-ashing interval.
✎
See “Procedure” in this section.
S
ETTING
GRATE
ASH
REMOVAL
AUGERS
AND
ASCENDING
AUGER
TIMES
This submenu is used for setting grate ash removal augers and the
ascending auger for the central ash removal.
✎
See “Procedure” in this section.
Pre-ventilation
: 30
/ 0
s
Heating up
: 10.0 / 0.0 m
Burning out
: 60.0 / 0.0 m
END
Time
3-03
Grate runtime cycles
:
1 / 0 i
Cleaning system pause time : 3.0/ 0.0 m
Grate runtime cycles long
:
2 / 0 i
Grate pause time long
:
9.0/ 0.0 m
END
When changing the heating material, the burn-out behaviour must
be checked on the grate of the boiler. If necessary, adjust the
Grate pause time
parameter. In general, only this parameter
should be changed, and the
Grate runtime cycles
parameter should only changed, where necessary, in exceptional
cases.
Time
3-04
Ash auger. Grate runtime
:
30/0
sAsh auger. Grate pause time :
13.0/0.0 m
Ascending auger lag time
:
30/0 s
END
Содержание M299
Страница 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Страница 2: ......
Страница 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 173: ...173 NOTICE ...
Страница 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 175: ......