4 Planning and installation – Installing the heating system
56
14.Insert suspension rail (K) with the right end in the vertical rail (H)
and fasten it with the M6 hexagon socket screws (5 mm spanner)
and intermediate washer to the vertical rail (H) or the corner
support.
15.Set the vertical rail (L) in the suspension rails.
16.Insert suspension rail (D) with the right end in the corner support
and fasten it with the M6 hexagon socket screws (5 mm spanner)
and intermediate washer.
17.Insert the three suspension rails (E) with the right ends in the
corner supports and fasten them with the M6 hexagon socket
screws (5 mm spanner) and intermediate washer.
18.Insert suspension rail (F) with the right end in the corner support
and fasten it with the M6 hexagon socket screws (5 mm spanner)
and intermediate washer.
Important!
The description in the following section applies only to systems
with an HDG TBZ 200.
Figure 4/20 - Installing the suspension rails (TBZ 200)
P
D
R
E
G
F
N
Q
O
Содержание M299
Страница 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Страница 2: ......
Страница 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 173: ...173 NOTICE ...
Страница 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 175: ......