4 Planning and installation – Installing the heating system
47
C
ONNECTING
MODULES
2. Place the heat exchanger (1) and the combustion unit (2) next to
each other.
3. Align the two units with plastic plates or flat steel strips (not
included in the scope of delivery) so they are in a horizontal plane.
4. Join the combustion unit (2) and heat exchanger (1) together on
both sides at the intended points (3) using the M12 screws (19 mm
spanner).
✓
The boiler is erected.
Figure 4/10 - Connecting modules
1
3
2
Содержание M299
Страница 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Страница 2: ......
Страница 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 173: ...173 NOTICE ...
Страница 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 175: ......