4 Planning and installation – Installing the heating system
65
I
NSTALLING
ASH
CONTAINERS
1. Remove the ash containers from the packaging.
2. Mount the two clamp handles (1 + 4) with the M8 hexagon socket
screws (6 mm spanner) and the M8 nuts (13 mm spanner).
3. Lift up the two clamp handles (1 + 4).
4. Insert the ash containers (3) on the ash removal pipe.
5. Press the clamp handles (1 + 4) downward.
✓
Grasp the clamp handles and press the ash containers against the
seal of the ash removal door.
6. If the handles do not clamp, adjust them as follows.
✓
Grasp the clamp handles and seal the ash containers solidly on the
ash removal door.
5. Close the ash containers in the reverse sequence.
6. Adjust the two support feet on the underside of the ash container
to the appropriate height.
✓
The ash containers are mounted and adjusted.
Figure 4/28 - Installing ash containers
2
1
3
4
1. Remove the cover from the
ash container.
2. Release the external nuts on
the ash container.
3. Adjust the ash container with
the inside nuts (1) until the
clamping handles latch firmly.
4. Screw the outer nuts tight
and check that the clamp
handles latch firmly.
Figure 4/29 - Adjusting the ash containers
1
Содержание M299
Страница 1: ...hdg bavaria com HDG M299 300 350 400 Operation Manual ...
Страница 2: ......
Страница 172: ...172 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 173: ...173 NOTICE ...
Страница 174: ...174 HDG M299 300 350 400 Version 1 de HDG Bavaria GmbH Juli 2005 NOTICE ...
Страница 175: ......