GSK218M CNC System Connection and PLC Manual
184
state
address
X4.7 X4.6
Pin
XS45.06
XS45.18
X4.6=spindle speed arrival signal input
;
X4.7
=
spindle zero speed check signal input.
Data parameter No.243
2 4 3
Spindle motor min. clamp speed .
Data parameter No.244
2 4 4
Spindle motor max. clamp speed.
Data parameter No.245
2 4 5
Time for check spindle speed arrival signal
Data parameter No.257
2 5 7
Spindle speed up limit during tapping cycle
Data parameter No.258
2 5 8
Spindle speed up limit
z
Operation time sequence
Time sequence of spindle operation is as Fig. 3-3-1:
z
Control
logic
①
The spindle stops and M05 outputs when CNC is turned on;
②
After M3/M4 is executed, it is enabled and M05 stops output.
4.10 Spindle automatic gear change control
z
Signals
Y3.4
~
Y3.6
:
Spindle automatic gear shift output signal
X4.1
~
X4.3
:
Spindle gear change completion signal
When CNC selects the spindle frequency conversion control (0
~
10V analog voltage output), it
Fig. 3-3-1 Spindle CW time
sequence
Spindle CW/CCW
Spindle stop
Содержание 218M
Страница 3: ...GSK 218M CNC System Connection and PLC Manual...
Страница 15: ...GSK218M CNC System Connection and PLC Manual 12 Volume one Programming...
Страница 70: ...GSK218M CNC System Connection and PLC Manual 67 Volume Two Function...
Страница 140: ...GSK218M CNC System Connection and PLC Manual 137 Volume Three Operation...
Страница 160: ...GSK218M CNC System Connection and PLC Manual 157 Volume Four Connection...
Страница 163: ...GSK218M CNC System Connection and PLC Manual 160 2 Side view 3 Overlook Without PC2 power supply...