GSK218M CNC System Connection and PLC Manual
14
1.3 Establishment of interface specifications
(
step 1
)
After deciding the control object specification and calculate the number of input/output signal
points, creat the interface specification.
For input/output interface signals, see Chapter 4.
1.4 Establishment of ladder diagram
(
step 2
)
Express the control operations decided by 218M ladder diagram. For the timer, meter, etc, which
cannot be expressed with the functional instructions.
The edited ladder should be converted into the corresponding PLC instruction to store.
1.5 Sequence program check
(
step 3
)
The sequence program can be checked in two ways:
1
)
Check by simulator
Instead of the machine, connect a simulator (consisting of lamps and switchs). Switch
ON/OFF stands for the input signal state of machine, lamp ON/OFF for the output signal
state.
2
)
Actual operation debugging
Debug sequence program through operating the machine. Do measures against the
unexpected affairs before debugging.
Содержание 218M
Страница 3: ...GSK 218M CNC System Connection and PLC Manual...
Страница 15: ...GSK218M CNC System Connection and PLC Manual 12 Volume one Programming...
Страница 70: ...GSK218M CNC System Connection and PLC Manual 67 Volume Two Function...
Страница 140: ...GSK218M CNC System Connection and PLC Manual 137 Volume Three Operation...
Страница 160: ...GSK218M CNC System Connection and PLC Manual 157 Volume Four Connection...
Страница 163: ...GSK218M CNC System Connection and PLC Manual 160 2 Side view 3 Overlook Without PC2 power supply...