
Inspecting the crankshaft alignment
With the specific tool shown check that the eccen-
tricity of the surfaces of diam. «
A
»-«
B
»-«
C
» are
within 0.03 mm. (reading limit on the dial gauge);
in addition, check the eccentricity of diam. «
D
», for
which a maximum reading of 0.02 mm is permitted.
In the case where eccentricity is not much above
prescribed levels,
straighten
the shaft by acting
on the counterweights with a shim or tighten them
in a clamp (with an aluminium bushing) as re-
quired..
Specific tooling
020335Y
Magnetic support for dial gauge
020074Y
Support base for checking crankshaft
alignment
Refitting the crankshaft
- Position the transmission side half crankcase on
two wooden supports
- Using a thermal gun, heat the bearing seat to
about 120°
- Firmly insert the crankshaft until the bearing rea-
ches the end-of-stroke stop
Runner RST 50 SP
Engine
ENG - 93
Содержание Runner RST 50 SP
Страница 1: ...SERVICE STATION MANUAL 639189 Runner RST 50 SP ...
Страница 4: ......
Страница 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Страница 17: ...INDEX OF TOPICS TOOLING TOOL ...
Страница 26: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Страница 37: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Страница 43: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Страница 60: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Страница 66: ...INDEX OF TOPICS ENGINE ENG ...
Страница 98: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Страница 109: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Страница 117: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS ...
Страница 123: ...Runner RST 50 SP Cooling system COOL SYS 123 ...
Страница 124: ...INDEX OF TOPICS CHASSIS CHAS ...
Страница 136: ...Chassis Runner RST 50 SP CHAS 136 ...
Страница 137: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Страница 141: ...INDEX OF TOPICS TIME TIME ...
Страница 143: ...Crankcase CRANKCASE Code Action Duration 1 001133 Engine crankcase Replacement Runner RST 50 SP Time TIME 143 ...