GE Healthcare
Direction 5743854-1EN, Revision 1 Optima XR642/XR648 Pre-Installation
Page 36
Section 3.0 - Delivery Requirements
Note: Table information is only applicable for Optima XR648.
3.5
Preparing the Delivery Route
1. Sketch out the Route
Begin preparing Route Survey by sketching the area of the hospital or clinic which will receive
the equipment. Include all areas on the delivery route from outside of building to destination.
See sample sketch below in.
The reference numbers in circles refer to the Route Survey data shown in Illustration 1-6. The Route Survey is
a form on which site data is listed.
Illustration 1-5 : Sample Route
2. Survey the Route
Record all loading capacities, corridor widths, door openings, turning radii, flooring materials,
elevator sizes, obstructions and so on for reference.
3. Check the Route
Verify equipment can actually be transported via the route determined.
Patient Barrier
1000mm (39.4in) 600mm (23.6in)
1800mm (70.9in)
80kg (176.4lbs)
box
410mm Footstool for Patient
Barrier
1040mm (41in)
850mm (33.5in)
550mm (21.7in)
17kg (37.5lbs)
box
Table 1-1 SHIPPING DATA
Component
Shipping Data
Shipping Dimensions (Approx)
SHIPPING
WEIGHT (approx)
SHIPPING
METHOD
Length
Width
Height
Pre-Install.book Page 36 Tuesday, January 30, 2018 2:36 PM