Direction 5743854-1EN, Revision 1 Optima XR642/XR648 Pre-Installation
Chapter 1 - General Requirements
Page 27
Chapter 1 General Requirements
Section 1.0 Objectives and Overview Summary
1.1
Objective and Scope of This Manual
This document is intended as a guide and informational resource for planning and properly
preparing a location for the installation of this system.
1.2
Summary
The purchaser is responsible for completion of “Pre-Installation.” This includes the procurement
and installation of all required materials and services to get the room ready for installation of the
product. This responsibility includes providing:
• A clean and safe work environment for installation of the product (finished floor, ceiling, walls,
and proper room lighting).
• A location suitable for the installation of the product.
• Suitable support structures in the floor, walls, or ceiling necessary for the mounting of the
product and/or its components.
• Installation of conduit, ducts and/or raceways necessary to route cables safely.
• Electrical power and grounds of specified quality and reliability.
• Electrical power of the required voltage, including an Emergency-Off safety switch in the room.
Power and ground cables to the PDU.
• Properly installed and sized junction boxes, including covers and fittings at locations required
and called out in architectural drawings.
• Use GE-recommended wires and cables as defined in this document.