Job Flow Procedure
199
Job Flow Sheets
7
Step 4 Starting a Job Flow
1
Load the original.
2
Press the <Start> button.
Important •
Always print the job history report to confirm the results after executing a job flow. For
information about the job history report, refer to "Job Status/Activity Report" (P.376).
Содержание Document Centre C250
Страница 1: ...Document Centre C450 C360 C250 User Guide ...
Страница 14: ......
Страница 98: ......
Страница 198: ......
Страница 204: ......
Страница 210: ......
Страница 356: ......
Страница 388: ......
Страница 408: ......
Страница 430: ......
Страница 487: ...Paper Jams 485 Problem Solving 16 4 Return the light finisher to the main body ...
Страница 535: ...18 Glossary This chapter describes the glossary provided by the machine z Glossary 534 ...
Страница 554: ......
Страница 556: ......