
43
Operational data collection
During the degassing event, please fill out the form as shown by the following example. (Forms
may be reproduced or copied.) Collection of this data allows FFS to assess if the system is
operating safely and efficiently and to optimize the process for your benefit. After the information
has been recorded, please photograph or scan the form and email it to: FFSTechSupport@
franklinfueling.com, or fax it to: +1 608 838 6433.
NV-ST-1000 TankSafe™ Delivery Unit Degassing Data form
Company Name
Date
Location
Work Order Number
Tank Type (UST, Railcar, etc)
Tank Volume
Fuel Type
Volume of Fuel Drained from Tank
Volume of Fuel remaining inside the tank
Ambient Temp
Ambient Humidity
Compressor Pressure and output (cfm/M³m)
Unit Start Time
Start LEL%
Unit Stop Time
Finish LEL%
Volume of TankSafe™ Product Used (liters)
Persistence (LEL over time)
Inlet connection dia and qty
Outlet dia and qty
Содержание NANOVAPOR NV-SS ST-1000
Страница 1: ...NANOVAPORTM VAPOR SUPPRESSION SYSTEM NV SS ST 1000 INSTALLATIONAND OPERATION GUIDE ...
Страница 18: ...14 Intentionally Blank ...
Страница 34: ...30 Intentionally Blank ...
Страница 40: ...36 Intentionally Blank ...
Страница 48: ...44 Time Vent Outlet LEL TANK TOP LEL TANK MIDDLE LEL TANK BOTTOM LEL ...
Страница 54: ...50 Intentionally Blank ...
Страница 59: ...Intentionally Blank ...
Страница 60: ...405758001 r1 ...