42
Operating checklists
Planning:
□
Air Compressor: Correct type
□
Tank Layout: Assessed and Verified
□
Flow Path: Identified
□
Inlet Opening: Identified
□
Outlet Opening: Identified
□
Connections: Manufactured
Preparation:
□
Permits: Issued & Valid
□
Isolation Certification: Agreed and Verified
□
Safety Briefing: Conducted
□
Fuel: Drained and Tank Bottomed Out
□
Tank: Isolated and Isolation Certificate Issued
□
Connections: Installed Correctly
Startup:
□
Compressor/NV-ST-1000 TankSafe™ Delivery Unit: Positioned Correctly
□
Earthing Wire: Connected and Tested
□
Compressor Valves: Closed
□
Air Hoses: Connected, Whipcheck Wires Fitted
□
TankSafe™ Product Suppl Container: Connected
□
Flex Ducting: Connected
□
Compressor: Start
□
Compressor Air Valves: Open
□
Unit Air Valves: Open
□
Spray Nozzle: Constant Spraying
□
Degas: Monitor %LEL
Shutdown:
□
Compressor: Engine Switched Off
□
Compressor Air Valves: Closed
□
Flex Ducting: Disconnect
□
Air Hoses: Disconnect
□
Unit Air Valves: Closed
□
Supply Tank: Disconnect
□
Earth (Ground) Wire: Disconnect
Post-Shutdown:
□
Connections: Removed
□
Tank % LEL: Verified
□
Tank Openings: Capped/Vented (as required)
□
Tank Vent Opening: As Required
□
Tank Measurements: Monitor %LEL
Содержание NANOVAPOR NV-SS ST-1000
Страница 1: ...NANOVAPORTM VAPOR SUPPRESSION SYSTEM NV SS ST 1000 INSTALLATIONAND OPERATION GUIDE ...
Страница 18: ...14 Intentionally Blank ...
Страница 34: ...30 Intentionally Blank ...
Страница 40: ...36 Intentionally Blank ...
Страница 48: ...44 Time Vent Outlet LEL TANK TOP LEL TANK MIDDLE LEL TANK BOTTOM LEL ...
Страница 54: ...50 Intentionally Blank ...
Страница 59: ...Intentionally Blank ...
Страница 60: ...405758001 r1 ...