![FLETCHER Alfamacchine U500 Скачать руководство пользователя страница 60](http://html1.mh-extra.com/html/fletcher/alfamacchine-u500/alfamacchine-u500_instruction-manual_2303844060.webp)
TRANSLATION OF THE ORIGINAL INSTRUCTIONS (Keep for future reference)
Codice Documento
Rev.
Data di salvataggio
Data di stampa
U500 - U600 ISTRUZIONI
02
04/11/2015
04/11/2015
EN
56
4.5. WORKING
CYCLE
DANGER – CAUTION
During normal use, the machine must only process the products/materials indicated in this manual.
Safety measures and the indications on residual risks must always be observed during machine operation.
For details on the functions of each control and signalling device, refer to the “Layout and description of the control and signalling devices”
given in the electrical diagram provided as an attachment to this manual.
Check the V-Nail magazine is full and the head is installed correctly;
reset any emergency conditions and close the mobile guards.
Insert the plug in the socket and switch the illuminated green power
switch to ON/1.
Wait for the operating system to boot; when the home page appears,
press the zero button to set the machine.
The machine is ready to commence operations. Start by placing
the mouldings on the working bench.
Press the vertical lock pedal and then press the start button on the
touch-screen.