![Festo CMMS-AS-G2 Series Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/festo/cmms-as-g2-series/cmms-as-g2-series_description_2283130057.webp)
5
Commissioning and in operation
Festo – GDCP-CMMS-AS-G2-FW-EN – 1310NH – English
57
Timing diagram: switch off motor controller via output stage enable signal
Controller enable
(DIN5)[X1.9]
Output stage enable
(DIN4)[X1.21]
Speed actual value
Holding brake released
(BR+)[X6.2]
Holding brake open
(mechanical)
t1
Controller ready for operation
(DOUT0)[X1.24]
t3
t4
t2
Output stage active
(DOUT… )[X1.…]
t1
≤
5 ms
t2
≤
2.5 ms
t3
L
50…500 ms
t4
= 0…6553 ms (FCT: dependent on the para-
metrised switch-off delay (brake control,
brake timing))
Fig. 5.11 Timing diagram: switch off motor controller via output stage enable signal
The holding brake is not suitable for braking the motor or moving masses.
Содержание CMMS-AS-G2 Series
Страница 1: ...Description Functions Firmware design from 1 4 0 2 6 8026161 1310NH Motor controller CMMS AS G2 ...
Страница 173: ......