Proline Cubemass C 100 HART
Installation
Hauser
23
2
3
1
8 mm
A0019768
6
Mounting kit for Cubemass mounting plate
1
1 x Cubemass mounting plate
2
4 x screw M5 x 8
3
4 x grommet
Zero point adjustment
All measuring devices are calibrated in accordance with state-of-the-art technology.
Calibration takes place under reference conditions→ 106. Therefore, a zero point
adjustment in the field is generally not required.
Experience shows that zero point adjustment is advisable only in special cases:
• To achieve maximum measuring accuracy even with low flow rates.
• Under extreme process or operating conditions (e.g. very high process temperatures or
very high-viscosity fluids).
6.2
Mounting the measuring device
6.2.1
Required tools
For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2
Preparing the measuring device
1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.
6.2.3
Mounting the measuring device
L
WARNING
Danger due to improper process sealing!
‣
Ensure that the inside diameters of the gaskets are greater than or equal to that of the
process connections and piping.
‣
Ensure that the seals are clean and undamaged.
‣
Secure the seals correctly.
Содержание Proline Cubemass C 100 HART
Страница 126: ...www addresses endress com...