ESIE13-03
|
Part 4. Maintenance
1. Yearly maintenance intervals and procedures
13/05/15
|
Version 2.0
Page 149
Ground source heat pump
Part 4. Maintenance
1. Yearly maintenance intervals and procedures
Following items should be checked on the product at least once a year:
•
Fluid pressure of Space Heating and brine circuit
• Brine
leakage
•
Relief valve hoses
•
Pressure relief valves of Space Heating and brine circuit
•
Pressure relief valve of Domestic Hot Water tank
• Filters
•
Draining of the Domestic Hot Water tank
• Anode
•
Descaling and chemical disinfection
• Switch
box
2. Maintenance procedures
The following procedures describe how to perform the maintenance on each items.
2.1. Checking fluid pressure of Space Heating and brine circuit
W
ARNING
Before performing any maintenance, power off the unit.
I
NFORMATION
After all checks are made, make sure the water and brine circuits are filled properly again and fluid pressures are okay
(1 - 2 bar).
Actions
Remarks
Check if fluid pressure between 1 and 2 bar.
Manometers are located under grey flap on front panel.
If pressure < 1 bar, add fluid.
Do not add to over 2 bar.
Содержание EGSQH10S18AA9W
Страница 1: ...Service Manual Ground source heat pump EGSQH10S18AA9W ESIE13 03 Version 2 0 ...
Страница 82: ...ESIE13 03 Part 2 Troubleshooting 4 Component checklist Page 82 13 05 15 Version 2 0 Ground source heat pump ...
Страница 148: ...ESIE13 03 Part 3 Repair 2 Unit specific repair procedures Page 148 13 05 15 Version 2 0 Ground source heat pump ...