ESIE13-03
|
Part 3. Repair
2. Unit specific repair procedures
13/05/15
|
Version 2.0
Page 117
Ground source heat pump
Figure 34 - Replacing the water pump - 2
11. Turn the pivoting power input section (3) to the left, refer to
"Unlocking the pivoting power input section" on page 90
.
12. Loosen the lower nut (2) from the corrugated pipe (3).
13. Remove the seal (4) from the corrugated pipe (3).
14. Loosen the nut (5) that fixes the water manometer capillary to the water pressure relief valve (6).
15. Remove the clip (7) that fixes the backup heater (9) to the domestic hot water circuit.
16. Remove the backup heater (9), water pump (8), water pressure relief valve (6) and the corrugated pipe (3) from the Daikin
Altherma GSHP and lay it on a support (10).
1. X25A
5. Water pump ground wire
2. A1P PCB
6. Grommet
3. X16A
7. Water pump wire
4. Screw
8. Cable guide
C
AUTION
The backup heater (9) is still connected to the Daikin Altherma GSHP.
6
1
3
4
2
5
8
7
Содержание EGSQH10S18AA9W
Страница 1: ...Service Manual Ground source heat pump EGSQH10S18AA9W ESIE13 03 Version 2 0 ...
Страница 82: ...ESIE13 03 Part 2 Troubleshooting 4 Component checklist Page 82 13 05 15 Version 2 0 Ground source heat pump ...
Страница 148: ...ESIE13 03 Part 3 Repair 2 Unit specific repair procedures Page 148 13 05 15 Version 2 0 Ground source heat pump ...