
MOTOR (MODEL 5BC59JBS6390)
Motor Installation
Page 26-14
2007-2008 XRT 800, 810 and 850 Maintenance and Service Manual
26
6. Insert the mounting bolts through the spring shackles and the bushings in the leaf spring eyes and install
locknuts. Tighten the bolts to 23 ft-lb (31 N·m).
See Leaf Spring Installation – All Vehicles, Section 9,
Page 9-4.
7. Install the shock absorbers. Tighten nut until rubber bushing expands to the diameter of the cup washer.
8. If removed, install wheels and finger tighten the lug nuts.
9. Lift vehicle and remove jack stands. Lower vehicle to the floor and tighten lug nuts, using a crisscross pat-
tern, to 55 ft-lb (74.6 N·m).
10. Place the Tow/Run switch in the TOW position and connect the batteries, positive (+) cable first. Tighten
battery terminals to 110 in-lb (12.4 N·m) and coat terminals with Battery Terminal Protector Spray (CCI
P/N 1014305) to minimize corrosion.
11. Place the Tow/Run switch in the RUN position.
12. Inspect the vehicle for proper operation.
See following WARNING.
ý
WARNING
• Make sure that the vehicle operates in the forward direction when the Forward/Reverse switch
is in the FORWARD position.
• Make sure that the vehicle operates in the reverse direction when the Forward/Reverse switch
is in the REVERSE position. The reverse buzzer will sound as a warning when the Forward/
Reverse switch is in REVERSE.
• Make sure that the vehicle does not operate when the Forward/Reverse switch is in the
NEUTRAL position.
Figure 26-17 Motor Installation
Figure 26-18 Motor Mount
24
25
VIEWED
FROM
DRIVER
SIDE
2
3
1
4
Содержание 2007 XRT 800
Страница 2: ......
Страница 20: ...1 ...
Страница 30: ...3 ...
Страница 50: ...4 ...
Страница 70: ...5 ...
Страница 114: ...9 ...
Страница 326: ......
Страница 348: ......
Страница 400: ...21 ...
Страница 438: ...23 ...
Страница 456: ...25 ...
Страница 472: ...26 ...
Страница 488: ...27 ...
Страница 500: ...28 ...
Страница 504: ...29 ...
Страница 514: ......
Страница 515: ......