
9-14
Cisco ASR 1000 Series Aggregation Services Routers Hardware Installation Guide
OL-13208-11
Chapter 9 Cisco ASR 1002-F Router Overview and Installation
Equipment Shelf or Tabletop Installation
Step 2
Lift the chassis into position on the equipment shelf or tabletop.
Figure 9-10
shows how to lift the
chassis.
Warning
At least two people are required to lift the chassis onto a tabletop or platform. To prevent injury, keep
your back straight and lift with your legs, not your back.
Statement 164
Figure 9-10
Lifting the Chassis
Note
The chassis in
Figure 9-10
does not represent the Cisco ASR 1002-F Router. This is only an example of
how to lift a Cisco chassis.
Step 3
Attach the front rack-mount brackets. Locate the threaded holes in the front sides of the chassis (first
holes beyond the vent holes) and use the package of black screws that shipped with the chassis.
Step 4
Align the front rack-mount bracket to one side of the chassis.
Step 5
Insert and tighten the screws on one side.
Step 6
Repeat Step 4 through Step 5 on the other side of the chassis. Use all the screws to secure the rack-mount
brackets to the chassis.
Note
The chassis rack-mount brackets must be installed first so that you can attach the
cable-management brackets to the chassis rack-mount brackets after the chassis is installed in
the rack.
Step 7
Gather the two cable-management brackets and screws that shipped with your chassis.
Figure 9-11
shows cable-management brackets attached on the front of the Cisco ASR 1002-F Router.
Note
Make certain that the cable-management bracket “U” feature device has the open end pointing
upwards when you attach it to the chassis
30007
1
3
2
4
0A
PROCE
SS
OR ONLY
0B
5
6
7
8
PROCE
SS
OR ONLY
POWER
FAULT
MI
S
WIRE
POWER
FAULT
MI
S
WIRE
CI
S
CO
10000
LINK
TX
RX
F
AIL
GIGABIT ETHERNET
CI
S
CO
10000
C
A
R
R
IE
R
A
L
A
R
M
L
O
O
P
F
A
IL
CH OC-12-D
S
O
S
M-IR
CI
S
CO
10000
C
A
R
R
IE
R
A
L
A
R
M
L
O
O
P
F
A
IL
6XCT3–D
S
0
0
5
4
3
2
1
CI
S
CO
10000
C
A
R
R
IE
R
A
L
A
R
M
L
O
O
P
F
A
IL
6XCT3–D
S
0
0
5
4
3
2
1
FA
IL
PERFORMANCE R
O
UTING ENGINE
C
O
N
S
O
LE
S
TA
T
U
S
A
C
O
C
R
IT
IC
A
L
M
IN
O
R
M
A
JO
R
E
T
H
E
R
N
E
T
LIN
K
A
C
T
IV
IT
Y
A
U
X
S
L
O
T
0
S
L
O
T
1
FA
IL
PERFORMANCE R
O
UTING ENGINE
C
O
N
S
O
LE
S
TA
T
U
S
A
C
O
C
R
IT
IC
A
L
M
IN
O
R
M
A
JO
R
E
T
H
E
R
N
E
T
LIN
K
A
C
T
IV
IT
Y
A
U
X
S
L
O
T
0
S
L
O
T
1
CI
S
CO
10000
C
A
R
R
IE
R
A
L
A
R
M
L
O
O
P
F
A
IL
6XCT3–D
S
0
0
5
4
3
2
1
CI
S
CO
10000
C
A
R
R
IE
R
A
L
A
R
M
L
O
O
P
F
A
IL
6XCT3–D
S
0
0
5
4
3
2
1
CI
S
CO
10000
C
A
R
R
IE
R
A
L
A
R
M
L
O
O
P
F
A
IL
6XCT3–D
S
0
0
5
4
3
2
1
CI
S
CO
10000
C
A
R
R
IE
R
T
X
R
X
F
A
IL
OC–12/
S
TM–4 PO
S
S
M–IR
FAN
S
OK
FAN
FAILUR
E
MULTI-
FAN
FAILURE
When hot
swapping th
is fan tray,
removal and
replaceme
nt must
be done in u
nder two min
utes or
system shu
tdown will oc
cur.
CAUTION
CI
S
CO
10000
CI
S
CO
10000