55
→
1 VDE-0126
2 VDE-4105
3 G59/2
4 C10/11
5 CEI 0-21
6 IEEE1547
7 BDEW
Figure 4-2 Select grid standard
5.) When the LCD screen shows the normal operation status (Figure 4-3) and
the “RUN” light on the LED panel lights up, it indicates that the grid connection
and power generation are successful.
(a) (b)
Figure 4-3 Normal operation status
6.) If the inverter fails to operate normally, “FAULT” light will light up and the
fault information will show on the LCD screen.
(Please refer to 7.1.2 Troubleshoot LCD faults)
7.) Set up system time and language
Set up the system time and language according to “5.4.4 System
configuration”.
8.) To check the real time operation information, you can refer to “5.4.1
Operation information”.
625 V
18.5A
231
23.1
223.2
PV1
08/12 13:10:05
622 V
19.3A
231
23.1
223.2
PV2
08/12 13:10:10
Содержание CPS SCA20KTL-DO
Страница 1: ...CPS SCA Series Grid tied PV Inverter CPS SCA20 25KTL DO Installation and Operation Manual Ver 1 0 ...
Страница 18: ...14 3 2 Mechanical installation 1 Dimensions Figure 3 2 Dimensions of CPS SCA20 25KTL DO series inverter ...
Страница 56: ...52 Figure 3 48 The ZigBee cable connection a b c d e ...
Страница 97: ...93 1 5 2 4 3 ...
Страница 98: ...94 Figure 7 1 Replace cooling fans 50 60mm mm 50 60mm mm 6 ...