51
b.) Put the Ethernet cable through the cable gland and inside the wiring box. Make
the cable terminals as shown in Figure 3-43.
Tools: Wire stripping pliers, crimping pliers
c.) Plug the cable terminal into the corresponding connector.
d.) Tighten the nut of the cable gland.
④
Zigbee communication cable connection:
a.) Take out the waterproof connector from the accessory kit. Loosen the nut at
the end of the cable gland, take off the waterproof rubber plug, and cut off one
of the hole of the rubber plug.
Tool: Utility knife
b.) Put the antenna cable through the rubber plug, and assemble the
waterproof cable gland in sequence. Tighten the nut at the end of the cable
gland.
c.) Screw off the plastic plug beside the communication cable gland.
Tool: 4mm flat screwdriver
d.) Screw on the waterproof cable gland in the unplugged hole, and fix the
ZigBee antenna at the bottom of the inverter.
Tool: No.2 Phillips head screwdriver
e.) Tighten the cable of the ZigBee antenna on the connector of
communication card.
Содержание CPS SCA20KTL-DO
Страница 1: ...CPS SCA Series Grid tied PV Inverter CPS SCA20 25KTL DO Installation and Operation Manual Ver 1 0 ...
Страница 18: ...14 3 2 Mechanical installation 1 Dimensions Figure 3 2 Dimensions of CPS SCA20 25KTL DO series inverter ...
Страница 56: ...52 Figure 3 48 The ZigBee cable connection a b c d e ...
Страница 97: ...93 1 5 2 4 3 ...
Страница 98: ...94 Figure 7 1 Replace cooling fans 50 60mm mm 50 60mm mm 6 ...