44
Figure 3-37 Take out the seal pin
b.) Put the dry contact communication cable through the cable gland and inside the
wiring box.
c.) Use double-layer insulated cables. Strip the cables according to the
following requirements.
Tool: Wire stripping pliers
Figure 3-38 Wire stripping
Table 3-12 Cable set-up
Position
Description
Value
Cable type
Double-layer insulated cable
D
A
L1
L2
Содержание CPS SCA20KTL-DO
Страница 1: ...CPS SCA Series Grid tied PV Inverter CPS SCA20 25KTL DO Installation and Operation Manual Ver 1 0 ...
Страница 18: ...14 3 2 Mechanical installation 1 Dimensions Figure 3 2 Dimensions of CPS SCA20 25KTL DO series inverter ...
Страница 56: ...52 Figure 3 48 The ZigBee cable connection a b c d e ...
Страница 97: ...93 1 5 2 4 3 ...
Страница 98: ...94 Figure 7 1 Replace cooling fans 50 60mm mm 50 60mm mm 6 ...