103
specifications on the product and in its related document;
Application beyond the scope of applicable safety or grid standards (VDE,
UL, etc.)
Unexpected disaster or force majeure
9.3 Quality clause (Warranty clause)
1. CPS will repair or replace with new products with malfunctions during
the warranty period.
2. The replaced non-functioning products should be returned to CPS.
3. Reasonable time should be provided to CPS for repair work.
Please do not hesitate to contact us if you have any questions
regarding CPS SCA20/25KTL-DO series grid-tied PV inverter. We are glad
to provide the best service for you.
Содержание CPS SCA20KTL-DO
Страница 1: ...CPS SCA Series Grid tied PV Inverter CPS SCA20 25KTL DO Installation and Operation Manual Ver 1 0 ...
Страница 18: ...14 3 2 Mechanical installation 1 Dimensions Figure 3 2 Dimensions of CPS SCA20 25KTL DO series inverter ...
Страница 56: ...52 Figure 3 48 The ZigBee cable connection a b c d e ...
Страница 97: ...93 1 5 2 4 3 ...
Страница 98: ...94 Figure 7 1 Replace cooling fans 50 60mm mm 50 60mm mm 6 ...