20
(4) Install the wiring box
①
Remove the cover plate at the bottom of the main housing. (see Figure
3-9)
Tool: No.2 Phillips head screwdriver
Figure 3-9 Cover plate of the main housing
②
Remove the cover board at the top of the wiring box (see Figure 3-10)
Figure 3-10 Cover board of the wiring box
Save the cover board and screws, and fix the board on the left side of the
wiring box after the wiring box is attached to the inverter housing (see