Figure 3-36 Schematic diagram of dry contact communication
If you connect the contact port to the power distribution grid, you must
install an individual miniature circuit-breaker between the dry contact and the
power distribution grid.
Dry contact communication cable connection:
a.) Screw off the nut of the communication cable gland, and take out one of the
seal pins.
COM
N.C.
N.O.
COM
N.C.
N.O.
COM
N.C.
N.O.
+ -
Light on in trouble free operational
Light on in error
Line circuit Breaker( 3 A)
(or L N)
COM
N.C.
N.O.
COM
N.C.
N.O.
COM
N.C.
N.O.
+ -
Line circuit Breaker( 3 A)
(or L N)
Fault
In operation
In operation
Содержание CPS SCA20KTL-DO
Страница 1: ...CPS SCA Series Grid tied PV Inverter CPS SCA20 25KTL DO Installation and Operation Manual Ver 1 0 ...
Страница 18: ...14 3 2 Mechanical installation 1 Dimensions Figure 3 2 Dimensions of CPS SCA20 25KTL DO series inverter ...
Страница 56: ...52 Figure 3 48 The ZigBee cable connection a b c d e ...
Страница 97: ...93 1 5 2 4 3 ...
Страница 98: ...94 Figure 7 1 Replace cooling fans 50 60mm mm 50 60mm mm 6 ...