80
Chapter 6 Operation
6.1 Start-up
Manual start-up
: Manual start-up is required after regulation setting or
manual (fault) shut-down. Move the cursor from the main operation interface
to
“4 Setting”. Press
ENT
and go to submenu “1 ON/OFF”. Then move the
cursor to “ON” and press
ENT
to start the inverter. Then the inverter will start
up and operate normally if the start-up condition is met. Otherwise, the inverter
stands by.
Automatic start-up
: The inverter will start up automatically when the
output voltage and power of PV arrays meet the set value, AC power grid is
normal, and the ambient temperature is within allowable operating range.
6.2 Shut-down
Manual shutdown
: Normally, it is not necessary to shutdown the inverter,
but it can be shut down manually if regulation setting or maintenance is
required.
Move the cursor from the main operation interface to “4 Setting”. Press
ENT
and go to submenu “1 ON/OFF”. Move the cursor to “OFF” and press
ENT
, and then the inverter will be shut down.
Automatic shutdown
: The inverter will be shut down automatically when
the output voltage and power of PV modules are lower than the set value, or
AC power grid fails; or the ambient temperature exceeds the normal range.
6.3 Operation mode
There are 4 operation modes. The following are corresponding indications
for each mode.
(1) System check mode for start up, as shown in Figure 6-1:
Содержание CPS SCA20KTL-DO
Страница 1: ...CPS SCA Series Grid tied PV Inverter CPS SCA20 25KTL DO Installation and Operation Manual Ver 1 0 ...
Страница 18: ...14 3 2 Mechanical installation 1 Dimensions Figure 3 2 Dimensions of CPS SCA20 25KTL DO series inverter ...
Страница 56: ...52 Figure 3 48 The ZigBee cable connection a b c d e ...
Страница 97: ...93 1 5 2 4 3 ...
Страница 98: ...94 Figure 7 1 Replace cooling fans 50 60mm mm 50 60mm mm 6 ...