MVE Biological Systems
TEC 3000 Operating and Maintenance Freezer Manual
13289499 Rev H •
138
9.3.
HEco TEC3000 (Back and Front Panel) Replacement
Back Panel
1. Disconnect the AC power cord from the back panel.
2. Open the working platform.
3. Disconnect the wiring harness from the plumbing connection interface.
4. Disconnect Temp A and Temp B probes along with the power input cable from the back panel.
5. Disconnect RJ45 cable from the front panel.
6. Remove 4 phillips head screws from the faceplate of the back panel
*Note: The power supply connection port will be grounded to one of the phillips head screws.
7. Remove the clear vinyl tubing from the back panel.
8. Gently remove the back panel from the working platform.
9. To install a new back panel, repeat steps 1-8 in reverse order; ensuring that the power supply is
grounded properly.
Front Panel
1. Disconnect the AC power cord from the back panel.
2. Open the working platform.
3. Disconnect the wiring harness from the plumbing connection interface.
4. Disconnect RJ45 cable from the front panel.
5. Disconnect the front panel ground wire from the working platform and remove the 4 phillips head
screws.
Содержание MVE 1842P-150
Страница 1: ...Chart Cryogenic Freezers with MVE TEC3000 Controllers Operating and Maintenance Manual ...
Страница 24: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 22 11 10 ...
Страница 106: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 105 8 4 Add On Menus ...
Страница 109: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 108 8 7 Liquid Level Menus ...
Страница 111: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 110 8 9 Advanced Settings Menus ...
Страница 112: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 111 8 10 Password Menus ...