Installation
NOTE: Do not apply power to the TEC 3000 controller or connect an LN2 supply until
later in this procedure to avoid injury or damaging the equipment.
Following the careful uncrating and unpacking of the freezer, install using these basic instructions.
Cabinet Series freezers will be shipped with some of the connections described below already installed.
NOTE: Only install the freezer on a level surface. Never fill freezer and move to another location. Always
fill the freezer where it is to be installed/used.
•
Locate the temperature sensor tube assembly that will house the two temperature probes. For
HE, HEco, and some Stock Series freezers, a three-tube temperature sensor assembly will be
installed in the center of the top of the freezer. The two smaller tubes are designed to house the
included temperature probes. The third, larger tube is designed to accommodate a third-party
temperature probe. A silicone plug will be installed in this third tube. If the third tube is going to be
used, simply remove the silicone plug. For the MVE Series (all open top freezers), a dual sensor
tube will be installed along the inside wall of the freezer storage space.
The CryoSystem 6000
temperature probes are inserted into the neck area.
•
Insert the two temperature probes into the sensor tubes and position the sensors at the preferred
height in the freezer space. Selecting probe A and B as well as the sensor placement is
adjustable and completely up to the user. MVE does recommend placing sensor (Temp A) at the
“top box” level. This refers to the level in the freezer space where the highest sample is being
stored. If storing vials in boxes, then this would be at the level with the top box. This is
recommended as it will be the warmest temperature experience by samples being stored in the
freezer space.
•
Connect the temperature probes to the TEC 3000 temperature ports using the twist lock
connectors.
•
For HEco models, once the temperature probes are in the desired position the freezer is ready to
be filled. Connect transfer hose to its fill source and proceed to step 2 of the first fill start up
procedure.
•
For HE models, once the temperature probes are in the desired position, apply a small amount of
the silicone sealant, included with the freezer, surrounding the temperature probes where they
enter the sensor tubes. This will help maintain their position and help keep moisture from entering
the freezer storage space. Proceed to the next step.
0.21 inches
(5.3 mm)
0.37 inches
(9.4 mm)
Содержание MVE 1842P-150
Страница 1: ...Chart Cryogenic Freezers with MVE TEC3000 Controllers Operating and Maintenance Manual ...
Страница 24: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 22 11 10 ...
Страница 106: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 105 8 4 Add On Menus ...
Страница 109: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 108 8 7 Liquid Level Menus ...
Страница 111: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 110 8 9 Advanced Settings Menus ...
Страница 112: ...MVE Biological Systems TEC 3000 Operating and Maintenance Freezer Manual 13289499 Rev H 111 8 10 Password Menus ...