83
82
Interval
Maintenance work
Personnel
yearly
Safety inspections of
- electric systems
- motor
Qualified electricians
in case of an error
Visual check
- of the entire machine
- of the cutter head and cutting table
Operating personnel
Visual check
- water pump
Specialist personnel
re-tightening and adjusting cutter head and cutting table
Operating personnel
in case of damage
change and replacement
- entire machine
- tool holder (flange and blade holder)
- tools (cutting blade)
- control elements (handles, locking rollers, etc.)
- water tank and hoses
- cutter head and cutting table
Operating personnel
change and replacement
- electric systems
- motor
- Water pump
Qualified electricians
STEPS AFTER COMPLETING MAINTENANCE
After completion of the maintenance works and before switching on, follow the following steps:
1. Check for tightness all threaded joints previously detached.
2. Check the proper installation of all previously removed protective devices and covers.
3. Make sure that all tools, materials and other equipment have been removed from the working zone.
4. Clean the working zone and remove any spilled substances such as liquids, processing materials or similar.
5. Make sure that all safety devices of the system function properly.
MAINTENANCE PLAN
Maintenance works necessary for optimum and trouble-free operation are described in the following sections.
- If an increased wear of parts is revealed by regular inspections, reduce the maintenance intervals!
- Draw up a maintenance log after every maintenance! The log assists in error analysis, enables adjusting the
intervals to actual usage conditions and validating guarantee claims.
- If you have any queries on maintenance works and intervals: contact manufacturer.
Interval
Maintenance work
Personnel
Before every commissioning
Visual check
- of the entire machine
- of the tool holder (flange and blade holder)
- of the tool (cutting wheel)
- of the control elements (handles, rollers, etc.)
- of the water tank and hoses
- of the cutter head and cutting table
Operating personnel
Visual check
- of the electric system
- of the motor
- of the water pump
Specialist personnel
cleaning the tool holder (flange and blade holder)
Operating personnel
checking the tool (cutting wheel) for replacement necessity
Operating personnel
cutter head and cutting table
- lubrication
- greasing
- oiling
- applying corrosion protection
Operating personnel
After completion of work
Cleaning of
- entire machine
- control elements (handles, rollers, etc.)
- tools (cutting wheel)
- cutter head and cutting table
Operating personnel
draining and cleaning water hoses and tank
Operating personnel
Cleaning of
- Motor housing
- Water pump
Specialist personnel
tool holder (flange and blade holder)
- lubrication
- greasing
- oiling
- applying corrosion protection
Operating personnel
weekly
Re-tightening and adjusting
- control elements (handles, rollers, etc.)
- cutter head and cutting table
- threaded joints
Operating personnel
Содержание T-3510
Страница 45: ...89 88 WIRING DIAGRAM T 4010 230V WIRING DIAGRAM T 3510 400V...
Страница 46: ...91 90 WIRING DIAGRAM T 5010 230V WIRING DIAGRAM T 4010 400V...
Страница 47: ...93 92 WIRING DIAGRAM T 6010 230V WIRING DIAGRAM T 5010 400V...
Страница 48: ...95 94 WIRING DIAGRAM T 7010 230V WIRING DIAGRAM T 6010 400V...
Страница 50: ...99 98...
Страница 51: ...www carat tools eu www carat tools com www carat tools be www carat tools nl www carat tools dk...