Upgrading Your Server 9-45
Removal
To remove the CPU, refer to steps 1 and 4 of the installation procedure and do the reverse procedure from steps 12 to 7.
IMPORTANT:
Do not remove a CPU unless it is defective.
After the operation, heat may make the cool seat at the bottom of the heat sink adhere to the
CPU. To remove the heat sink from the CPU, first turn the heat sink to the left and right lightly
to make sure that the heat sink can be apart from the CPU. Removing the heat sink with it
adhering to the CPU may cause the CPU and/or socket to be defective.
Do the following procedure if a CPU is removed (or replaced).
1.
Start SETUP and select "Main" – "Processor Settings" – "Processor Retest" in the order to clear the error
information for the removed CPU (see Chapter 4).
When a CPU is replaced, select "Main" – "Processor Settings" and check that the ID, L2 Cache, and L3 Cache of
the additional CPU are defined normally (see Chapter 4).
2.
Set "Reset Configuration Data" in the Advanced menu to "Yes."
This is required to update the hardware configuration information. See Chapter 4 for details.
Содержание NovaScale R440 E2
Страница 1: ...NovaScale R440 E2 User s Guide NOVASCALE REFERENCE 86 A1 46FB 00...
Страница 2: ......
Страница 32: ...1 16 Notes on Using Your Server...
Страница 70: ...2 38 General Description...
Страница 94: ...3 24 Setting Up Your Server This page is intentionally left blank...
Страница 147: ...Configuring Your Server 4 53 Property of Physical Device in the Universal RAID Utility...
Страница 187: ...Configuring Your Server 4 93 6 Click Home at the lower left of the screen to go back to the WebBIOS Top Menu...
Страница 272: ...5 74 Installing the Operating System with Express Setup This page is intentionally left blank...
Страница 281: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator appears...
Страница 308: ...7 12 Maintenance This page is intentionally left blank...
Страница 349: ...Troubleshooting 8 41 When you use a local console When you use a remote console 6 Each tool is selected and it starts...
Страница 408: ...9 54 Upgrading Your Server Screws...
Страница 415: ...Upgrading Your Server 9 61 When connecting to the optional RAID controller installed in the low profile slot...
Страница 416: ...9 62 Upgrading Your Server When connecting to the optional RAID controller installed in the full height slot...
Страница 446: ...9 92 Upgrading Your Server This page is intentionally left blank...
Страница 456: ......
Страница 458: ...C 2 IRQ This page is intentionally left blank...
Страница 490: ...D 32 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete...
Страница 494: ......
Страница 544: ...G 2 Using a Client Computer with a CD Drive This page is intentionally left blank...
Страница 548: ...H 4 Product Configuration Record Table This page is intentionally left blank...
Страница 551: ......
Страница 552: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 46FB 00...