
5-26 Installing the Operating System with Express Setup
6.
Select a team type ([Adapter Fault Tolerance]/[Adaptive Load Balancing]).
Click [Next].
7.
Click [Finish].
8.
Click [TEAM: "Team name"] from [Device manager]
→
[Network adapters] to modify the team. Click [Settings] tab
and click [Modify Team] button.
9.
Refer to the following procedure to set the team member adapter priority status.
–
Set Primary
Select the adapter and click the [Set Primary] button.
–
Set Secondary
Select the adapter and click the [Set Secondary] button.
NOTE:
Adapter priority configuratioin can be confirmed by the following procedure:
1. Click [TEAM: "Team name"] from [Device manager]
→
[Network adapters].
2. Click [Settings] and confirm Adapters in the team list.
10.
Click [Test Switch]
→
[Run test] to confirm the adapter team is properly setup.
Confirm the result in [Test results].
Even if the system is normal, the following mismatch message will appear sometimes. Recheck the switching hub
(L2) port and if there is no problem with the setting, ignore the messages.
–
The switch is configured with aggregatedd ports,
but the team type does not support port aggregation.
The switch is configured with VLAN tagging, but
the team has no VLANs.
–
Change the team type to SLA, reconfigure the
switch for link aggregation, or disable VLAN
tagging on the switch.
11.
Reboot the system.
Содержание NovaScale R440 E2
Страница 1: ...NovaScale R440 E2 User s Guide NOVASCALE REFERENCE 86 A1 46FB 00...
Страница 2: ......
Страница 32: ...1 16 Notes on Using Your Server...
Страница 70: ...2 38 General Description...
Страница 94: ...3 24 Setting Up Your Server This page is intentionally left blank...
Страница 147: ...Configuring Your Server 4 53 Property of Physical Device in the Universal RAID Utility...
Страница 187: ...Configuring Your Server 4 93 6 Click Home at the lower left of the screen to go back to the WebBIOS Top Menu...
Страница 272: ...5 74 Installing the Operating System with Express Setup This page is intentionally left blank...
Страница 281: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator appears...
Страница 308: ...7 12 Maintenance This page is intentionally left blank...
Страница 349: ...Troubleshooting 8 41 When you use a local console When you use a remote console 6 Each tool is selected and it starts...
Страница 408: ...9 54 Upgrading Your Server Screws...
Страница 415: ...Upgrading Your Server 9 61 When connecting to the optional RAID controller installed in the low profile slot...
Страница 416: ...9 62 Upgrading Your Server When connecting to the optional RAID controller installed in the full height slot...
Страница 446: ...9 92 Upgrading Your Server This page is intentionally left blank...
Страница 456: ......
Страница 458: ...C 2 IRQ This page is intentionally left blank...
Страница 490: ...D 32 Installing Windows Server 2008 4 Activate Windows The Windows activation is complete...
Страница 494: ......
Страница 544: ...G 2 Using a Client Computer with a CD Drive This page is intentionally left blank...
Страница 548: ...H 4 Product Configuration Record Table This page is intentionally left blank...
Страница 551: ......
Страница 552: ...BULL CEDOC 357 AVENUE PATTON B P 20845 49008 ANGERS CEDEX 01 FRANCE REFERENCE 86 A1 46FB 00...