PL-6000DC Two Post Parking Lift
54
P/N 5900273 — Rev. A1 — May 2022
Drill the Offside Post Anchors
⚠
WARNING
You
must
wear OSHA-approved (publication 3151) appropriate protective
equipment at all times during installation: leather gloves, steel-toed work boots, eye
protection, back belts, and hearing protection are
mandatory
.
Carefully drill the 12 mm Anchor Bolt holes 130 mm deep for the Offside Post. Refer to
to reference the drilling procedure.
Carefully clean the holes using compressed air and vacuum, then insert the anchors. Thread the
Washers and Hex Nuts onto the Anchors, but leave finger tight. Do
not
tighten.
Drill the Front Support Anchor Positions Ø12 mm x 130 mm deep, vacuum and clean holes as
done in the Powerside Anchor procedure. Insert the Anchors and assemble with the Washer and
Hex Nuts finger tight. Do
not
tighten.
Operate the Lift up and down again (5) five times. Verify every part of the Lift is working correctly,
free from obvious noises or abnormalities.
If the Lift is operating correctly,
tighten all anchor bolts.
Lubrication
Keep the moving parts of the Lift lubricated to protect and extend the life of the Lift:
•
Weekly to Monthly
. Lubricate the Balance and Lifting Chains. The frequency of chain lubrication
is dependent on the operating environment. Refer to the
specifics and frequency.
•
Monthly
. Lubricate the inside of the Lift Posts where the Rubber Slides travel with White Lithium
Grease.
•
Monthly
. Lubricate the Sliders on the Carriages with White Lithium Grease.
Operational Test
BendPak recommends performing an Operational Test of your Lift with a typical Vehicle
before
beginning normal usage.
Performing an Operational Test will help you get a feel for how to operate the Lift and helps to purge
any residual air out of the Hydraulic System.
During the Operational Test, watch the operating components and check for proper installation and
operation. If you run into an issue that does not go away, refer to
information.
Note
:
Residual air in the Hydraulic System can cause the Lift to shake, move erratically, or
squeak; this is normal. It gradually decrease cease after a few up-down cycles as the Lift
Hydraulics are a self-bleeding system.
To perform an Operational Test
:
Check the area around and above the Lift for obstructions; move them if you find any.
If you are going to run the test with a typical Vehicle, drive it onto the Lift Platform.
Insert the key, turn it to the left (counterclockwise) toward
Up
on the control, to raise the Lift
Platform.
Содержание PL-6000DC
Страница 12: ...PL 6000DC Two Post Parking Lift 12 P N 5900273 Rev A1 May 2022 Typical Height Requirements ...
Страница 20: ...PL 6000DC Two Post Parking Lift 20 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Страница 31: ...PL 6000DC Two Post Parking Lift 31 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Страница 37: ...PL 6000DC Two Post Parking Lift 37 P N 5900273 Rev A1 May 2022 Install the Cylinder Head Cover ...
Страница 70: ...PL 6000DC Two Post Parking Lift 70 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Страница 73: ...PL 6000DC Two Post Parking Lift 73 P N 5900273 Rev A1 May 2022 Labels ...
Страница 74: ...PL 6000DC Two Post Parking Lift 74 P N 5900273 Rev A1 May 2022 ...
Страница 75: ...PL 6000DC Two Post Parking Lift 75 P N 5900273 Rev A1 May 2022 ...
Страница 80: ...PL 6000DC Two Post Parking Lift 80 P N 5900273 Rev A1 May 2022 ...
Страница 84: ...PL 6000DC Two Post Parking Lift 84 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 85: ...PL 6000DC Two Post Parking Lift 85 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 86: ...PL 6000DC Two Post Parking Lift 86 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 87: ...PL 6000DC Two Post Parking Lift 87 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 88: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 BendPak Inc All rights reserved bendpak com ...