To Wire the Junction Box
:
Verify power is disconnected and locked-out before beginning any work on the Lift.
The Control Console is prewired. A
Control Console Wiring Diagram
reference.
Connect the wiring to Power, the Limit Switch, Power Unit and Solenoid as indicated by the
Verify the wiring against the Wiring Diagram before applying Power to the Lift.
First Operational Test and Level Adjustment
Apply power to the Lift and raise the platform approximately 70 in. / 1800 mm.
Adjust the Balance Chain. Using a four-foot Level, measure and adjust the level of the platform
using the threaded rod on top of the Offside Post. Check the level condition of the platform in at
least four places to verify the Platform is level front to back and side to side.
Verify the levelness and perpendicularity of the Offside Post. Verify that both posts are parallel to
each other. Shim Lift Posts as required to make perpendicular. Do
not
exceed .5 in / 12.7 mm in
Shim height.
Operational Test one. Operate the Lift from ground to maximum height at least two times.
At the completion of this test, verify the Posts are parallel and the Lift Platform is level.
A = B
and
A1 = B1
. Refer to the figure below.
Measure the diagonal distances of the Lift Platform corner to corner. Verify the diagonals are equal
within .25 in. / 5mm. Adjust as required to make the diagonals equal.
Tighten all bolts and fasteners
on the Platform and the Lift Structure,
except
the Anchor
Bolts. Final tightening of the Anchor bolts will be completed after drilling the Offside Post Anchors.
Содержание PL-6000DC
Страница 12: ...PL 6000DC Two Post Parking Lift 12 P N 5900273 Rev A1 May 2022 Typical Height Requirements ...
Страница 20: ...PL 6000DC Two Post Parking Lift 20 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Страница 31: ...PL 6000DC Two Post Parking Lift 31 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Страница 37: ...PL 6000DC Two Post Parking Lift 37 P N 5900273 Rev A1 May 2022 Install the Cylinder Head Cover ...
Страница 70: ...PL 6000DC Two Post Parking Lift 70 P N 5900273 Rev A1 May 2022 Drawing not to scale ...
Страница 73: ...PL 6000DC Two Post Parking Lift 73 P N 5900273 Rev A1 May 2022 Labels ...
Страница 74: ...PL 6000DC Two Post Parking Lift 74 P N 5900273 Rev A1 May 2022 ...
Страница 75: ...PL 6000DC Two Post Parking Lift 75 P N 5900273 Rev A1 May 2022 ...
Страница 80: ...PL 6000DC Two Post Parking Lift 80 P N 5900273 Rev A1 May 2022 ...
Страница 84: ...PL 6000DC Two Post Parking Lift 84 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 85: ...PL 6000DC Two Post Parking Lift 85 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 86: ...PL 6000DC Two Post Parking Lift 86 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 87: ...PL 6000DC Two Post Parking Lift 87 P N 5900273 Rev A1 May 2022 Maintenance Log ...
Страница 88: ...1645 Lemonwood Drive Santa Paula CA 93060 USA 2022 BendPak Inc All rights reserved bendpak com ...