
50
Load Curve
– I need to run a pure cut 300 Watt load curve, and there isn’t a footswitch
cable available for my DUT. I need to take 10 measurements with loads from 50 to 5000
ohms.
Solution
–
1. From the Autosequence menu, select Add Step.
2. Select the desired location for the new step and press OK.
3. The new step will always default to an instruction type step. Select the Load Curve
option button near the bottom of the screen.
4. Press the Title text box to change the step title as desired. You will need to use
an external keyboard for this.
5. Press the Instructions to Operator text box to enter any instructions that the user
might need to perform at this step of the autosequence.
6. Press the Meter Setup button to configure the load curve.
7. Press The Setup Loads tab at the top of the screen to configure the Loads
Содержание ESU-2400
Страница 1: ...ELECTROSURGICAL UNIT ANALYZER ESU 2400 Series USER MANUAL...
Страница 2: ......
Страница 9: ...vii...
Страница 44: ...32 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 46: ...34 5 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 48: ...36 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 50: ...38 6 Trigger the DUT The ESU 2400 will show the mA RMS measurement in the display...
Страница 177: ...165 This Page Intentionally Left Blank...
Страница 186: ...174 NOTES...
Страница 187: ...175 NOTES...
Страница 188: ...176 NOTES...
Страница 189: ......